Boise to Las Vegas (BOI-LAS): nonstop upgrade & award space
Alaska Airlines and Frontier Airlines fly the BOI to LAS nonstop about 9 times a week. The timetable below shows the nonstop scheduled at 1h 54m to 1h 57m for the 520 miles. 2LNR checks confirmed upgrade and award space on Alaska Airlines flights on this route, so you can see which departures have space before you book.
Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.
Updated .
Boise to Las Vegas flight schedule
Scheduled nonstop departures for BOI to LAS starting October 24, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.
Schedule data dated .
| Date | Flight | Airline | Departs BOI | Arrives LAS | Duration | Aircraft |
|---|---|---|---|---|---|---|
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| F9 1934 | Frontier Airlines | 14:50 | 15:44 | 1h 54m | Airbus A321neo family | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| F9 1934 | Frontier Airlines | 14:50 | 15:44 | 1h 54m | Airbus A321neo family | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 | |
| F9 1934 | Frontier Airlines | 14:49 | 15:43 | 1h 54m | Airbus A321 | |
| AS 2021 | Alaska Airlines, Inc. | 14:27 | 15:24 | 1h 57m | Embraer E175 |
Showing all 10 scheduled BOI to LAS departures across 7 days with service, starting October 24, 2026. Later dates are on the interactive map.
Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.
Aircraft on the Boise to Las Vegas nonstop
In the schedule table on this page, Alaska Airlines flies the Embraer E175, and Frontier Airlines flies the Airbus A321neo family and the Airbus A321. Each linked aircraft page shows where that airline schedules it. Airlines can swap aircraft up to departure.
Confirmed upgrade & award space on BOI to LAS departures
2LNR tracks confirmed upgrade and award space on Alaska Airlines, segment by segment and date by date. Open the calendar for Boise to Las Vegas to see which departures have space, the next 14 days free on every product and the full horizon on Pro.
Alaska Airlines award space was open on 9 of the 14 Boise to Las Vegas departure dates from October 19 to November 1 that 2LNR checked in the 7 days to October 19, 2026.
See real availability
Confirmed upgrade or award seats by date on the BOI to LAS departures 2LNR tracks, checked against live inventory so you know what's open before you book.
Set an alert
Premium inventory turns over fast. Watch this route on Pro and 2LNR notifies you when space appears on a date you're tracking.
Plan on the map
See BOI to LAS on the interactive route map, with schedules, connections, and route statistics.
Airlines flying Boise to Las Vegas nonstop
Carriers operating BOI to LAS nonstop in the current schedule. Where 2LNR tracks the carrier, its departures show confirmed upgrade or award space by date.
Frequently asked questions about BOI to LAS
How long is the flight from Boise (BOI) to Las Vegas (LAS)?
Which airlines fly nonstop from BOI to LAS?
How many flights a week are there from BOI to LAS?
What time do flights from BOI to LAS depart?
Which flights operate BOI to LAS nonstop?
How do I check upgrade or award availability on BOI to LAS?
Never miss BOI to LAS upgrade or award space
See what's open by date on this route, the next 14 days free on every product and the full horizon on Pro.
Get started free