Dubai to Ho Chi Minh City (DXB-SGN): nonstop flights and award space
Emirates flies nonstop between Dubai (DXB) and Ho Chi Minh City (SGN), roughly 14 times a week. In the timetable below it flies as EK 364 and EK 392, scheduled at 6h 55m to 7h 30m for the 3,492 miles. 2LNR tracks award seats on Emirates across every DXB to SGN date, so you can see whether a seat exists before you move points.
Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.
Updated .
Dubai to Ho Chi Minh City flight schedule
Scheduled nonstop departures for DXB to SGN starting October 22, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.
Schedule data dated .
| Date | Flight | Airline | Departs DXB | Arrives SGN | Duration | Aircraft |
|---|---|---|---|---|---|---|
| EK 364 | Emirates | 04:00 | 14:30 | 7h 30m | Airbus A350-900 | |
| EK 392 | Emirates | 09:35 | 20:00 | 7h 25m | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 14:30 | 7h 30m | Airbus A350-900 | |
| EK 392 | Emirates | 09:35 | 20:00 | 7h 25m | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 14:30 | 7h 30m | Airbus A350-900 | |
| EK 392 | Emirates | 09:35 | 20:00 | 7h 25m | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 13:55 | 6h 55m | Boeing 777-200LR | |
| EK 392 | Emirates | 09:35 | 19:35 | 7h | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 13:55 | 6h 55m | Boeing 777-200LR | |
| EK 392 | Emirates | 09:35 | 19:35 | 7h | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 13:55 | 6h 55m | Boeing 777-200LR | |
| EK 392 | Emirates | 09:35 | 19:35 | 7h | Airbus A350-900 | |
| EK 364 | Emirates | 04:00 | 13:55 | 6h 55m | Boeing 777-200LR | |
| EK 392 | Emirates | 09:35 | 19:35 | 7h | Airbus A350-900 |
Showing all 14 scheduled DXB to SGN departures across 7 days with service, starting October 22, 2026. Later dates are on the interactive map.
Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.
Aircraft on the Dubai to Ho Chi Minh City nonstop
Emirates flies the departures in the schedule table on this page with the Airbus A350-900 and the Boeing 777-200LR. Each linked aircraft page shows where that airline schedules it. Airlines can swap aircraft up to departure.
Award seats on DXB to SGN departures
2LNR tracks award seats on Emirates, date by date. Open the calendar for Dubai to Ho Chi Minh City to see whether a seat exists before you move points, the next 14 days free on every product and the full horizon on Pro.
Emirates award space was open on all 14 Dubai to Ho Chi Minh City departure dates from October 19 to November 1 that 2LNR checked in the 7 days to October 19, 2026.
See real availability
Award seats by date on the DXB to SGN departures 2LNR tracks, checked against live inventory so you know what's open before you book.
Set an alert
Premium inventory turns over fast. Watch this route on Pro and 2LNR notifies you when space appears on a date you're tracking.
Plan on the map
See DXB to SGN on the interactive route map, with schedules, connections, and route statistics.
Airlines flying Dubai to Ho Chi Minh City nonstop
Carriers operating DXB to SGN nonstop in the current schedule. Where 2LNR tracks the carrier, its departures show award space by date.
Frequently asked questions about DXB to SGN
How long is the flight from Dubai (DXB) to Ho Chi Minh City (SGN)?
Which airlines fly nonstop from DXB to SGN?
How many flights a week are there from DXB to SGN?
What time do flights from DXB to SGN depart?
Which flights operate DXB to SGN nonstop?
How do I check award availability on DXB to SGN?
See DXB to SGN award space by date
See what's open by date on this route, the next 14 days free on every product and the full horizon on Pro.
Get started free