Seville to Santander (SVQ-SDR): nonstop flights and who flies them

Volotea flies nonstop from Seville (SVQ) to Santander (SDR) just three times a week. In the timetable below it flies as V7 3269, scheduled at 1h 25m for the 429 miles.

Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.

Updated .

3
Flights a week, 4-week average
1h 25m
Scheduled flight time
429 mi
Nonstop distance
Free
To get started

Seville to Santander flight schedule

Scheduled nonstop departures for SVQ to SDR starting October 23, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.

Schedule data dated .

Scheduled nonstop departures from Seville (SVQ) to Santander (SDR)
Date Flight Airline Departs SVQ Arrives SDR Duration Aircraft
V7 3269Volotea09:0510:301h 25mAirbus A320
V7 3269Volotea18:0519:301h 25mAirbus A320
V7 3269Volotea09:0510:301h 25mAirbus A320
V7 3269Volotea08:3510:001h 25mAirbus A320
V7 3269Volotea18:0519:301h 25mAirbus A320
V7 3269Volotea17:0018:251h 25mAirbus A320
V7 3269Volotea17:0018:251h 25mAirbus A320

Showing all 7 scheduled SVQ to SDR departures across 7 days with service, starting October 23, 2026. Later dates are on the interactive map.

Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.

See every SVQ to SDR date on the interactive map

Aircraft on the Seville to Santander nonstop

Volotea flies the Airbus A320 on every departure in the schedule table on this page.

The full SVQ to SDR nonstop schedule

This page carries the full SVQ to SDR nonstop schedule, who operates each departure and how often it runs; the reverse direction is linked below.

See the schedule

Who operates each SVQ to SDR nonstop and how often it runs, from 2LNR's schedule data.

Plan on the map

See SVQ to SDR on the interactive route map, with schedules, connections, and route statistics.

Airlines flying Seville to Santander nonstop

Carriers operating SVQ to SDR nonstop in the current schedule.

Frequently asked questions about SVQ to SDR

How long is the flight from Seville (SVQ) to Santander (SDR)?
V7 3269 is scheduled at 1h 25m from Seville (SVQ) to Santander (SDR) on every departure in the schedule table on this page. The nonstop covers about 429 miles, and airlines adjust scheduled times by season, so confirm with the airline before you book.
Which airlines fly nonstop from SVQ to SDR?
Volotea is currently the only airline flying SVQ to SDR nonstop. 2LNR doesn't show award or upgrade space for it on SVQ to SDR, so this page carries the schedule rather than a space claim.
How often does SVQ to SDR operate?
The SVQ to SDR nonstop currently runs three times a week, on Volotea. Thin schedules like this change by season, and on Pro an alert will catch anything added.
What time do flights from SVQ to SDR depart?
Scheduled SVQ to SDR nonstops in the next 7 days with service leave between 08:35 and 18:05, local time at Seville. The schedule table on this page lists every departure by date, with its arrival time and aircraft.
Which flights operate SVQ to SDR nonstop?
Volotea flies V7 3269 nonstop from Seville (SVQ) to Santander (SDR), the only flight number in the schedule table on this page. The table lists each date with its departure and arrival times and aircraft.
Does 2LNR show upgrade or award space on SVQ to SDR?
Not on this route: 2LNR doesn't show award or upgrade space for Volotea on SVQ to SDR. The page carries the full SVQ to SDR nonstop schedule and who flies each departure, and the reverse direction is linked below.

See the full SVQ to SDR nonstop schedule

Every scheduled departure on this route, with who flies it. 2LNR shows upgrade and award space by date on the carriers it tracks, the next 14 days free on every product and the full horizon on Pro.

Get started free