Bordeaux to Seville (BOD-SVQ): nonstop flights and who flies them

Transavia France and Volotea fly nonstop from Bordeaux (BOD) to Seville (SVQ) just twice a week. The timetable below shows the nonstop scheduled at 1h 40m to 1h 45m for the 579 miles.

Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.

Updated .

2
Flights a week, 4-week average
1h 40m to 1h 45m
Scheduled flight time
579 mi
Nonstop distance
Free
To get started

Bordeaux to Seville flight schedule

Scheduled nonstop departures for BOD to SVQ starting October 22, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.

Schedule data dated .

Scheduled nonstop departures from Bordeaux (BOD) to Seville (SVQ)
Date Flight Airline Departs BOD Arrives SVQ Duration Aircraft
TO 4884Transavia France17:5519:351h 40mBoeing 737-800
V7 2138Volotea19:2521:101h 45mAirbus A320
TO 4884Transavia France15:1517:001h 45mBoeing 737-800
TO 4884Transavia France15:1517:001h 45mBoeing 737-800
TO 4884Transavia France15:1517:001h 45mBoeing 737-800
TO 4884Transavia France15:1517:001h 45mBoeing 737-800
TO 4884Transavia France15:1517:001h 45mBoeing 737-800

Showing all 7 scheduled BOD to SVQ departures across 7 days with service, starting October 22, 2026. Later dates are on the interactive map.

Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.

See every BOD to SVQ date on the interactive map

Aircraft on the Bordeaux to Seville nonstop

In the schedule table on this page, Transavia France flies the Boeing 737-800, and Volotea flies the Airbus A320.

The full BOD to SVQ nonstop schedule

This page carries the full BOD to SVQ nonstop schedule, who operates each departure and how often it runs; the reverse direction is linked below.

See the schedule

Who operates each BOD to SVQ nonstop and how often it runs, from 2LNR's schedule data.

Plan on the map

See BOD to SVQ on the interactive route map, with schedules, connections, and route statistics.

Airlines flying Bordeaux to Seville nonstop

Carriers operating BOD to SVQ nonstop in the current schedule.

Frequently asked questions about BOD to SVQ

How long is the flight from Bordeaux (BOD) to Seville (SVQ)?
Scheduled flight times from Bordeaux (BOD) to Seville (SVQ) run from 1h 40m to 1h 45m across the departures in the schedule table on this page. The nonstop covers about 579 miles, and airlines adjust scheduled times by season, so confirm with the airline before you book.
Which airlines fly nonstop from BOD to SVQ?
Transavia France and Volotea fly BOD to SVQ nonstop. 2LNR doesn't show award or upgrade space for any of them on BOD to SVQ, so this page carries the schedule rather than a space claim.
How often does BOD to SVQ operate?
The BOD to SVQ nonstop currently runs twice a week. Thin schedules like this change by season, and on Pro an alert will catch anything added.
What time do flights from BOD to SVQ depart?
Scheduled BOD to SVQ nonstops in the next 7 days with service leave between 15:15 and 19:25, local time at Bordeaux. The schedule table on this page lists every departure by date, with its arrival time and aircraft.
Which flights operate BOD to SVQ nonstop?
In the schedule table on this page, BOD to SVQ nonstops fly as TO 4884 on Transavia France and V7 2138 on Volotea. The table lists each departure by date with its times and aircraft.
Does 2LNR show upgrade or award space on BOD to SVQ?
Not on this route: 2LNR doesn't show award or upgrade space for any airline flying BOD to SVQ. The page carries the full BOD to SVQ nonstop schedule and who flies each departure, and the reverse direction is linked below.

See the full BOD to SVQ nonstop schedule

Every scheduled departure on this route, with who flies it. 2LNR shows upgrade and award space by date on the carriers it tracks, the next 14 days free on every product and the full horizon on Pro.

Get started free