Guadalajara to Cancun (GDL-CUN): nonstop flights and who flies them

Volaris and VivaAerobus fly nonstop between Guadalajara (GDL) and Cancun (CUN), roughly 48 times a week. The timetable below shows the nonstop scheduled at 2h 44m to 2h 56m for the 1,061 miles.

Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.

Updated .

48
Flights a week, 4-week average
2h 44m to 2h 56m
Scheduled flight time
1,061 mi
Nonstop distance
Free
To get started

Guadalajara to Cancun flight schedule

Scheduled nonstop departures for GDL to CUN starting October 22, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.

Schedule data dated .

Scheduled nonstop departures from Guadalajara (GDL) to Cancun (CUN)
Date Flight Airline Departs GDL Arrives CUN Duration Aircraft
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus06:3910:302h 51mAirbus A321
Y4 1048Volaris08:2012:042h 44mAirbus A320neo
VB 2133VivaAerobus10:4914:452h 56mAirbus A320
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
Y4 1046Volaris14:3018:142h 44mAirbus A320
VB 7413VivaAerobus17:3721:252h 48mAirbus A321
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus06:3910:302h 51mAirbus A320
Y4 1048Volaris08:2012:042h 44mAirbus A320neo
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
VB 2133VivaAerobus12:0015:562h 56mAirbus A320
Y4 1046Volaris14:3018:142h 44mAirbus A321neo family
VB 7413VivaAerobus17:3721:252h 48mAirbus A321
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus07:4911:402h 51mAirbus A320
Y4 1048Volaris08:2012:042h 44mAirbus A320neo
VB 2133VivaAerobus10:3414:302h 56mAirbus A320
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
Y4 1046Volaris14:3018:142h 44mAirbus A321neo family
VB 7413VivaAerobus17:3021:202h 50mAirbus A320
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus06:3910:302h 51mAirbus A320
Y4 1048Volaris08:2012:042h 44mAirbus A321neo family
Y4 5900Volaris10:0013:442h 44mAirbus A320neo
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
Y4 1046Volaris14:3018:142h 44mAirbus A320neo
VB 7413VivaAerobus17:3721:252h 48mAirbus A321
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus06:3910:302h 51mAirbus A320
Y4 1048Volaris08:2012:042h 44mAirbus A321neo family
VB 2133VivaAerobus10:4914:452h 56mAirbus A320
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
Y4 1046Volaris14:3018:142h 44mAirbus A320neo
VB 7413VivaAerobus17:3721:252h 48mAirbus A321
Y4 1052Volaris06:1109:552h 44mAirbus A320neo
VB 2141VivaAerobus06:3910:302h 51mAirbus A320
Y4 1048Volaris08:2012:042h 44mAirbus A321neo family
Y4 1050Volaris11:4415:282h 44mAirbus A320neo
Y4 1046Volaris14:3018:142h 44mAirbus A320neo

Showing the first 40 of 48 scheduled GDL to CUN departures across 7 days with service, starting October 22, 2026. Every remaining date is on the interactive map.

Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.

See every GDL to CUN date on the interactive map

Aircraft on the Guadalajara to Cancun nonstop

In the schedule table on this page, Volaris flies the Airbus A320neo, the Airbus A321neo family, and the Airbus A320, and VivaAerobus flies the Airbus A320 and the Airbus A321. Each linked aircraft page shows where that airline schedules it. Airlines can swap aircraft up to departure.

The full GDL to CUN nonstop schedule

This page carries the full GDL to CUN nonstop schedule, who operates each departure and how often it runs; the reverse direction is linked below.

See the schedule

Who operates each GDL to CUN nonstop and how often it runs, from 2LNR's schedule data.

Plan on the map

See GDL to CUN on the interactive route map, with schedules, connections, and route statistics.

Airlines flying Guadalajara to Cancun nonstop

Carriers operating GDL to CUN nonstop in the current schedule.

Frequently asked questions about GDL to CUN

How long is the flight from Guadalajara (GDL) to Cancun (CUN)?
Scheduled flight times from Guadalajara (GDL) to Cancun (CUN) run from 2h 44m to 2h 56m across the departures in the schedule table on this page. The nonstop covers about 1,061 miles, and airlines adjust scheduled times by season, so confirm with the airline before you book.
Which airlines fly nonstop from GDL to CUN?
Volaris and VivaAerobus fly GDL to CUN nonstop. 2LNR doesn't show award or upgrade space for any of them on GDL to CUN, so this page carries the schedule rather than a space claim.
How many flights a week are there from GDL to CUN?
About 48 nonstop flights a week run between Guadalajara (GDL) and Cancun (CUN) in the current schedule, operated by Volaris and VivaAerobus. Frequency shifts by season, and the schedule table on this page shows what is scheduled next.
What time do flights from GDL to CUN depart?
Scheduled GDL to CUN nonstops in the next 7 days with service leave between 06:11 and 17:37, local time at Guadalajara. The schedule table on this page lists every departure by date, with its arrival time and aircraft.
Which flights operate GDL to CUN nonstop?
In the schedule table on this page, GDL to CUN nonstops fly as Y4 1046, Y4 1048, Y4 1050, Y4 1052, and Y4 5900 on Volaris, and VB 2133, VB 2141, and VB 7413 on VivaAerobus. The table lists each departure by date with its times and aircraft.
Does 2LNR show upgrade or award space on GDL to CUN?
Not on this route: 2LNR doesn't show award or upgrade space for any airline flying GDL to CUN. The page carries the full GDL to CUN nonstop schedule and who flies each departure, and the reverse direction is linked below.

See the full GDL to CUN nonstop schedule

Every scheduled departure on this route, with who flies it. 2LNR shows upgrade and award space by date on the carriers it tracks, the next 14 days free on every product and the full horizon on Pro.

Get started free