Chicago to Guadalajara (ORD-GDL): nonstop flights and who flies them
Volaris, VivaAerobus, and Aeroméxico fly nonstop between Chicago (ORD) and Guadalajara (GDL), roughly 21 times a week. The timetable below shows the nonstop scheduled at 4h 4m to 4h 10m for the 1,733 miles.
Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.
Updated .
Chicago to Guadalajara flight schedule
Scheduled nonstop departures for ORD to GDL starting October 22, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.
Schedule data dated .
| Date | Flight | Airline | Departs ORD | Arrives GDL | Duration | Aircraft |
|---|---|---|---|---|---|---|
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321neo family | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:35 | 4h 5m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 | |
| Y4 1703 | Volaris | 02:53 | 05:57 | 4h 4m | Airbus A321neo family | |
| VB 547 | VivaAerobus | 12:30 | 15:40 | 4h 10m | Airbus A320 | |
| Y4 1705 | Volaris | 13:49 | 16:53 | 4h 4m | Airbus A321 |
Showing all 21 scheduled ORD to GDL departures across 7 days with service, starting October 22, 2026. Later dates are on the interactive map.
Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.
Aircraft on the Chicago to Guadalajara nonstop
In the schedule table on this page, Volaris flies the Airbus A321neo family and the Airbus A321, and VivaAerobus flies the Airbus A320. Each linked aircraft page shows where that airline schedules it. Airlines can swap aircraft up to departure.
The full ORD to GDL nonstop schedule
This page carries the full ORD to GDL nonstop schedule, who operates each departure and how often it runs; the reverse direction is linked below.
See the schedule
Who operates each ORD to GDL nonstop and how often it runs, from 2LNR's schedule data.
Plan on the map
See ORD to GDL on the interactive route map, with schedules, connections, and route statistics.
Airlines flying Chicago to Guadalajara nonstop
Carriers operating ORD to GDL nonstop in the current schedule.
Frequently asked questions about ORD to GDL
How long is the flight from Chicago (ORD) to Guadalajara (GDL)?
Which airlines fly nonstop from ORD to GDL?
How many flights a week are there from ORD to GDL?
What time do flights from ORD to GDL depart?
Which flights operate ORD to GDL nonstop?
Does 2LNR show upgrade or award space on ORD to GDL?
See the full ORD to GDL nonstop schedule
Every scheduled departure on this route, with who flies it. 2LNR shows upgrade and award space by date on the carriers it tracks, the next 14 days free on every product and the full horizon on Pro.
Get started free