South Highpoint to Moline (PIE-MLI): nonstop flights and who flies them
Allegiant Air flies nonstop from South Highpoint (PIE) to Moline (MLI) just twice a week. The timetable below shows the nonstop scheduled at 2h 39m to 2h 46m for the 1,035 miles.
Schedule last confirmed . Departure times come from 2LNR's schedule data; confirm with the airline before you book.
Updated .
South Highpoint to Moline flight schedule
Scheduled nonstop departures for PIE to MLI starting October 22, 2026, last checked against our schedule feed on October 18, 2026. Airlines retime and cancel flights, so confirm with the airline before you book.
Schedule data dated .
| Date | Flight | Airline | Departs PIE | Arrives MLI | Duration | Aircraft |
|---|---|---|---|---|---|---|
| G4 983 | Allegiant Air | 09:00 | 10:39 | 2h 39m | Boeing 737 MAX 8 | |
| G4 2705 | Allegiant Air | 09:00 | 10:39 | 2h 39m | Boeing 737 MAX 8 | |
| G4 2702 | Allegiant Air | 08:05 | 09:44 | 2h 39m | Boeing 737 MAX 8 | |
| G4 2702 | Allegiant Air | 08:05 | 09:44 | 2h 39m | Boeing 737 MAX 8 | |
| G4 2705 | Allegiant Air | 09:00 | 10:39 | 2h 39m | Boeing 737 MAX 8 | |
| G4 2598 | Allegiant Air | 07:30 | 09:16 | 2h 46m | Airbus A319 | |
| G4 2624 | Allegiant Air | 06:30 | 08:16 | 2h 46m | Boeing 737 MAX 8 |
Showing all 7 scheduled PIE to MLI departures across 7 days with service, starting October 22, 2026. Later dates are on the interactive map.
Departure and arrival times are local at their own airport, so an arrival can fall on a different local date than the departure; the duration column is the true elapsed flying time. A dash means the airline hasn't filed that value in the schedule data we hold. Aircraft are the equipment the airline filed, named where the code pins down one type and shown as the family or the bare code where it doesn't. Swaps can happen up to departure.
Aircraft on the South Highpoint to Moline nonstop
Allegiant Air flies the departures in the schedule table on this page with the Boeing 737 MAX 8 and the Airbus A319. Each linked aircraft page shows where that airline schedules it. Airlines can swap aircraft up to departure.
The full PIE to MLI nonstop schedule
This page carries the full PIE to MLI nonstop schedule, who operates each departure and how often it runs; the reverse direction is linked below.
See the schedule
Who operates each PIE to MLI nonstop and how often it runs, from 2LNR's schedule data.
Plan on the map
See PIE to MLI on the interactive route map, with schedules, connections, and route statistics.
Airlines flying South Highpoint to Moline nonstop
Carriers operating PIE to MLI nonstop in the current schedule.
Frequently asked questions about PIE to MLI
How long is the flight from South Highpoint (PIE) to Moline (MLI)?
Which airlines fly nonstop from PIE to MLI?
How often does PIE to MLI operate?
What time do flights from PIE to MLI depart?
Which flights operate PIE to MLI nonstop?
Does 2LNR show upgrade or award space on PIE to MLI?
See the full PIE to MLI nonstop schedule
Every scheduled departure on this route, with who flies it. 2LNR shows upgrade and award space by date on the carriers it tracks, the next 14 days free on every product and the full horizon on Pro.
Get started free